The airport has been developed in an area of over 690 acres, at a cost of more than ₹640 crore. With a 2,300 m runway, the airport is suitable for all weather day operations.
The airport has been developed in an area of over 690 acres, at a cost of more than ₹640 crore. With a 2,300 m runway, the airport is suitable for all weather day operations.