The floor of the cable bridge in Morbi was repaired with four-layered aluminium sheets which made the bridge heavier while the cable was not replaced.
The floor of the cable bridge in Morbi was repaired with four-layered aluminium sheets which made the bridge heavier while the cable was not replaced.